FILE – This Nov. 3, 2015 file photo shows the Keystone Steele City pumping station, into which the planned Keystone XL pipeline is to connect to, in Steele City, Neb. Pipeline sponsor TC Energy says it has started preliminary work along its route through the U.S. as opponents wait for a judge to rule on their request to block the project. (AP Photo/Nati Harnik, File)

Canadian firm starts US prep work for Keystone XL pipeline

Opponents await a judge’s ruling on their request to block any work

A Canadian company said Wednesday it has started preliminary work along the route of the proposed Keystone XL oil sands pipeline through the U.S. in anticipation of starting construction next month, as opponents await a judge’s ruling on their request to block any work.

TC Energy spokeswoman Sara Rabern said the Calgary-based company was moving equipment this week and will begin mowing and felling trees in areas along the pipeline’s 1,200-mile (1,930-kilometre) route within the next week or so.

The work is planned in Montana, South Dakota and Nebraska, Rabern said. She did not provide further location details.

ALSO READ: U.S. judge blocks construction of $10-billion Keystone XL pipeline

In April the company plans to begin construction at the line’s border crossing in northern Montana. That would be a huge milestone for a project first proposed in 2008 that has since attracted bitter opposition from climate activists who say fossil fuel usage must be curbed to combat global warming.

The company also plans work next month on employee camps in Fallon County, Montana and Haakon County, South Dakota.

Environmental groups in January asked U.S. District Judge Brian Morris to block any work. They said clearing and tree felling along the route would destroy bird and wildlife habitat. The judge in December had denied a request from environmentalists to block construction because no work was immediately planned.

The request by environmentalists came days after the Trump administration approved a right-of-way allowing the $8 billion line to be built across federal land.

ALSO READ: Alberta still pushing for Keystone XL pipeline after U.S. stoppage

“It is irresponsible for TC Energy to jump the gun before Judge Morris rules on our motion,” Stephan Volker, an attorney for the Indigenous Environmental Network and North Coast Rivers Alliance, said Wednesday.

Keystone XL was rejected twice under former President Barack Obama over worries it could make climate change worse.

The pipeline would transport up to 830,000 barrels (35 million gallons) of crude oil daily from western Canada to terminals on the U.S. Gulf Coast.

President Donald Trump has been a strong proponent. The Republican issued a special permit for the pipeline last year after Morris had blocked the project in November 2018, citing potential spills and other environmental concerns.

A legal challenge to Trump’s permit is pending before Morris.

ALSO READ: South Dakota Keystone XL opponents point to N. Dakota spill

Another oil pipeline in TC Energy’s Keystone network in October spilled an estimated 383,000 gallons (1.4 million litres) of oil in eastern North Dakota. Critics say a damaging spill from Keystone XL is inevitable given the length of the line and the many rivers and other waterways it would cross beneath.

Matthew Brown, The Associated Press

Like us on Facebook and follow us on Twitter

Keystone XL

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Comments are closed

Just Posted

EIDES grade sixes tranisition into high school

The grade six graduation was celebrated with a congratulatory walk from EIDES to FSS

Shred Kelly celebrates release of new album

Their latest compilation, Like a Rising Sun is available on all streaming platforms

FAR celebrates summer opening

The mountain is now open to hikers, bikers and sightseers who want some terrain to explore

Fernie seniors celebrate graduation with a reverse parade

Hundreds of locals turned up to congratulate the seniors on their graduation

QUIZ: Put your knowledge of Canada to the test

How much do you know about our country?

‘This year is unlike any other’: Trudeau delivers Canada day address

Sophie Gregoire Trudeau and the Prime Minister release video celebrating the national holiday

B.C. repairs COVID-19 emergency order for local government

Ombudsperson shut out as his recommendations implemented

Canadian engineer detained in Egypt released, needs treatment, family says

Yasser Albaz was detained at the Cairo airport after a business trip in February of 2019

RCMP arrest armed man on grounds near Trudeau residence

Officers descended on the sprawling estate Thursday morning.

Canada Day tractor incident kills three children, injures seven in Quebec

The tractor driver has been arrested following the accident

Undercover operation exposes prominent human trafficking problem in Greater Victoria

VicPD’s Operation No More took place in mid-June at a local hotel

Tsilhqot’in Nation demands meeting with feds on declining Fraser River chinook stocks

The Nation wants to partner with DFO to rebuild and recover the stocks

PHOTOS: Dual rallies take over Legislature lawn on Canada Day

Resist Canada 153 highlighted colonization and genocide, Unify the People called COVID a hoax

Gov. General honours Canadians for bravery, volunteer service

Five categories of winners presented on Canada Day

Most Read