A Chevron logo appears at a gas station in Miami on July 25, 2011. The Canada Energy Regulator says it has approved an application from Chevron Canada to export natural gas from the Kitimat LNG project for a term of 40 years over environmental opposition. THE CANADIAN PRESS/AP, Lynne Sladky

Chevron’s move to exit Kitimat LNG project a dash of ‘cold water’ for gas industry

Canada Energy Regulator approved a 40-year licence to export natural gas for Kitimat LNG

The decision by Chevron Corp. to try to sell its 50 per cent stake in the Kitimat LNG project on the B.C. coast throws a symbolic dash of “long-dated cold water” on growth in the Canadian natural gas industry, an analysis says.

The California-based company announced the potential sale in its 2020 budget, adding it would also cut funding to gas-related ventures including Kitimat LNG and its shale gas fields in the northeastern United States.

It also announced a charge of at least US$10 billion against its assets because of expected lower long-term prices for oil and gas.

“With (Tuesday’s) budget, Chevron threw some long-dated cold water on the Canadian gas macro, as the company announced they are reducing funding for the Kitimat LNG project,” said analysts at Tudor Pickering Holt & Co. in a report Wednesday.

“While we don’t think investors were baking in any long-term gas demand related to the project, any advancements likely would have been well received.”

The analysts pointed out Chevron has access to about 100 million cubic feet per day of gas production to supply the proposed project to super-cool and ship out as much as 2.3 billion cubic feet of gas per day.

Chevron’s move is the latest in a string of setbacks for B.C.’s nascent liquefied natural gas industry which once boasted nearly 20 proposed projects with the implied promise of a new higher-priced export market in Asia for Western Canada’s abundant natural gas resources.

READ MORE: LNG Canada project gradually taking shape

Chevron is not the first company to want out of Kitimat LNG — it bought its 50 per cent stake from Calgary-based Encana Corp. and Houston-based EOG Resources, Inc., in December 2012.

In the same transaction, Houston-based producer Apache Corp. raised its stake in Kitimat LNG from 40 per cent to 50 per cent. But two years later, under pressure from activist investors, it sold that stake to Australian Woodside Petroleum Ltd., which remains Chevron’s partner.

Malaysian energy giant Petronas cancelled its Pacific NorthWest LNG project in 2017 and later joined the Royal Dutch Shell-led $40-billion LNG Canada project, which remains the only project under construction after being green-lighted in 2018.

Finance Minister Bill Morneau said Wednesday the federal government still sees a “very positive opportunity” for LNG in Canada, suggesting Chevron remains committed to seeing the project move forward despite its efforts to rebalance its asset portfolio.

READ MORE: Coastal GasLink receives first delivery of pipe sections

Earlier this month, the Canada Energy Regulator approved a 40-year licence to export natural gas for Kitimat LNG, doubling its previous licence duration and nearly doubling the potential output of the facility to 18 million tonnes of liquefied natural gas per year, a substantial increase over the previous 10-million-tonne licence which was set to expire at the end of this year.

Chevron said its decisions are part of its global portfolio optimization effort focused on improving returns and driving value.

“Although Kitimat LNG is a globally competitive LNG project, the strength of Chevron Corp.’s global portfolio of investment opportunities is such that the Kitimat LNG Project will not be funded by Chevron and may be of higher value to another company,” Chevron said in a statement.

“Chevron intends to commence soliciting expressions of interest for its interests in the Kitimat LNG Project. No timeline has been set to conclude this process.”

The company said it would continue to work with Woodside and government and First Nations partners during the process.

The Kitimat LNG project includes upstream natural gas lands in the Liard and Horn River Basins in northeastern B.C., the 471-kilometre Pacific Trail Pipeline and the gas liquefaction facility at Bish Cove near Kitimat.

Dan Healing, The Canadian Press


Like us on Facebook and follow us on Twitter.

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

File photo
Main Roads warns of snow over weekend

It’s expected to snow in most areas covered by the East Kootenay Service Area

Tom Shypitka, Wayne Stetski, Kerri Wall and moderator Thomas Skelton at the Oct. 15 Elk Valley all-candidates forum. (Source: zoom)
At a glance: Kootenay East candidates go head-to-head in Elk Valley forum

Shypitka, Stetski and Wall called in to the zoom forum to talk all things Elk Valley

Kootenay-Columbia MP Rob Morrison speaks during Question Period in the House of Commons.
MP Morrison responds to federal throne speech, pushes for rapid testing at airports

Kootenay-Columbia parliamentarian criticizes throne speech, wants COIVD-19 testing at borders, airports

Anne Jimmie holds up a photo of her and her mother, Christine Jimmy, that was taken in 1948. Photo: Aaron Hemens
Saving the inner child: The Healing Journey

“There was this little girl inside that was so hurt, that was so wounded … I needed to nurture that little girl and understand her.”

Candidates running for Kootenay East participated in a Zoom debate hosted by the Cranbrook Chamber of Commerce on Wednesday afternoon. Trevor Crawley photo.
Candidates debate economic issues during Cranbrook business forum

Topics focused on business and economic issues in forum hosted by Chamber of Commerce

In this photo provided by Shannon Kiss, smoke from the CalWood Fire billows, Sunday, Oct. 18, 2020, as seen from Gunbarrel, Colo. (Shannon Kiss via AP)
‘First guys out:’ western Canadian air tanker fleet busy despite drop in wildfires

CEO believes wildfires have become more dangerous in recent years as people live closer to where they start

The BC Ferries vessel the Queen of Oak Bay. (News Bulletin file photo)
‘Buy a boat,’ Horgan advises anti-maskers on BC Ferries

NDP leader John Horgan talks COVID-19 misinformation

Canadian and American flags fly near the Ambassador Bridge at the Canada-USA border crossing in Windsor, Ont. on Saturday, March 21, 2020. Restrictions on non-essential travel between Canada and the United States are being extended until at least Nov. 21. THE CANADIAN PRESS/Rob Gurdebeke
Non-essential travel restrictions at Canada-U.S. border extended to at least Nov. 21

The restrictions do not apply to those providing essential services in either country

Jordan Naterer, 25, was last seen Saturday Oct. 10. He planned a hike in the Manning Park area, and has not been seen since. Photo Facebook.
Family devastated as search for missing Manning Park hiker suspended

‘It was an extremely difficult meeting with the parents when we had to tell them.’

Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

FILE - Nathan Cullen speaks to media in Smithers, B.C., Friday, February 28, 2020. THE CANADIAN PRESS/Jonathan Hayward
Horgan, Cullen apologize for NDP candidate’s comments about Haida candidate

Nathan Cullen had made insensitive comments about Roy Jones Jr. Cheexial

In this photo illustration, a provincial election mail-in ballot sealed in an Elections B.C. return envelope is seen before being deposited in a Canada Post mailbox, in Richmond, B.C., Saturday, Oct. 17, 2020. The final result of British Columbia’s provincial election won’t be known for at least two weeks because more than 700-thousand mail-in ballots have to be counted by hand. THE CANADIAN PRESS/Darryl Dyck
B.C.’s snap election means 700k ballots will be counted manually, delaying results

Elections BC spokesman said employees in 87 electoral districts will count mail-in ballots one by one

Chief Public Health Officer Dr. Theresa Tam takes part during a press conference during the COVID pandemic in Ottawa on Friday, Oct. 16, 2020. As parts of Canada face a new round of COVID-19-related restrictions, Canada’s chief public health officer is urging Canadians to continue making a “collective effort” to tackle the pandemic.THE CANADIAN PRESS/Sean Kilpatrick
Chief public health officer calls for continued ‘collective effort’ against COVID-19

Canada continues to climb toward the 200,000 mark for COVID-19 cases

Jordan Naterer, an electrical engineer from Vancouver, was last seen Saturday Oct. 10. Facebook photo.
‘Please pray for our son,’ says mother of missing Manning Park hiker

Searchers continue efforts to find 25-year-old Vancouver man in Manning Park

Most Read