Fernie Fire Hall. Phil McLachlan/The Free Press

City commissions another fire hall roof study

  • Sep. 22, 2019 4:30 p.m.

Fernie City Council has authorized staff to reallocate the existing budget from the arena dehumidifier project to commission a structural engineering assessment and concept design of the fire hall up to a total project cost of $23,500.

The vote was in reference to the fire hall roof structure, which was the subject of a 1997 study by Armstrong Engineering. The study identified that the current roof structure is insufficient to support snow loads as per the building code that was current at the time. Snow loading requirements have since been increased.

Consultation records with WorkSafeBC in 2016 identified that the City had concerns about the structural load capacity of the fire hall roof as it relates to snow load. Staff developed a snow shoveling procedure in response to reduce risks.

An assessment by Kassian Dyck Engineering completed in 2016, to visually assess the structural condition of exposed members, determined that several members do not have sufficient capacity for the 1970 design loads.

The new structural engineering assessment timeline is 10 weeks from the project award date.

Just Posted

First responders host holiday food drive

Frozen fingers knocked on doors around Fernie on Wednesday evening as part… Continue reading

Fernie Physiotherapy hosts open house

Health care professionals and community members gathered at Fernie Physiotherapy and Sports… Continue reading

Rob Morrison sworn in as Kootenay-Columbia MP

Parliament set to reconvene on Thursday with election of House Speaker, Throne Speech

Fernie students continue climate strike

On Friday morning, students from Fernie Secondary School, The Fernie Academy and… Continue reading

Kootenay Employment Services gives hope to young people

The Kootenay Employment Services 9KES) Aspire Program, headquartered in Cranbrook, is celebrating… Continue reading

VIDEO: Rockslide closes Highway 93 in Fairmont Hot Springs

Geotechnical team called in to do an assessment after rocks fell from hoodoos

Threats to the Fraser River at ‘new zenith,’ says river conservationist

The ‘Heart of the Fraser’ should be deemed ecologically significant according to ORC statement

Grandparents raising children: Shuswap grandma sees need for support

Peer group formed for those who have unexpectedly taken on the role of parenting

Final appeal rejected for man convicted in deaths of missing Alberta seniors

Lyle and Marie McCann were in their 70s when they left their home in St. Albert in 2010 and vanished

Thieving gun-toting Santa breaks into Princeton restaurant, makes icing sugar sandwich

The suspect allegedly made a sandwich of icing sugar and ham

Infants should be tested for autism if older siblings are diagnosed, Canadian study suggests

Blood test for infants with sibling who’s been diagnosed would get information to families earlier

Kootenay Lake ferry labour dispute ends with ratified agreement

The deal was approved by 83 per cent of members

Province gives $4.93M boost to school-based gang prevention program

The funding will see the ‘Erase’ program expand from 12 to 16 communities

Half of shoppers say they have no holiday spending budget

B.C. consumers surveyed estimate they will spend $921 this season

Most Read